在线永久免费观看黄网站-亚洲旡码欧美大片-亚洲日韩v无码中文字幕-真实的国产乱xxxx在线

S&T: Deposit welding Robot is commissioned at SFRE

Date:2019/2/5 Source: CISDI

Deposit welding Robot is commissioned at SFRE

CISDI teams have created a robot capable of high-quality deposit welding.

During pilot tests, the robot was able to perform surface deposit welding on wedges, guides and support sleeves.

It has now been handed over to SFRE and is in commission in one of its workshops, where the robot’s welds are so reliable, no defects have been detected by the surface flaw inspector.

Copper surface deposit welding prevails at SFRE. However, it’s a dangerous task; high-heat toxic gas, metal steam and metal dust are generated which are dangerous to workers’ health. Producing welds of consistent quality also requires a high level of skill and labour and procedure-transfer costs can be high.

The Robot can complete non-standard copper deposit welding at one duty position and reduces manpower.

CISDI will transplant the knowledge it has gained into other metallurgical robot developments.

 

Deposit welding robot fact file:

Applicable for non-standard copper deposit welding in a single piece and in small batches, with diverse varieties and without clamps, and also for the automatic deposit welding of carbon steel and stainless steel

Stable and reliable quality

Gives a high degree of flexibility. The robot can be adapted for various shapes of surface deposit welding and for non-standard, clamp-free and positioning-free pieces

Easy training – no need for repeat programming

Much less labour-intensive

Can be programmed offline

Capable of deposit welding on curves in a complicated space

 

Below; comparisons between robot-work and manual deposit welding:

Method

Efficiency

Quality

Human Risk

Rectangular surface

230mm×85mm

Triangular surface

230mm, 70mm

Long bar surface

1,180mm×20mm

Robot

Preparation time (min.)

Welding time (min.)

Preparation time (min.)

Welding time (min.)

Preparation time (min.)

Welding time (min.)

Reliable and stable, a high first pass rate, zero re-working

No human involvement

8

32

5

11

6

25

Manual

Welding time (min.)

Welding time (min.)

Welding time (min.)

Unstable quality, a low pass rate, a high re-working rate

High risk of severe injury from toxic gas and metals dust

50

25

45

 

The rotary arm of a deposit welding robot in action

 

The working plane of a deposit welding robot

 

Wedges with deposit welding completed by the robot


A drum with deposit welding performed by the robot

主站蜘蛛池模板: 又硬又粗又大一区二区三区视频| 午夜福利09不卡片在线机视频| 少妇特殊按摩高潮惨叫无码| 中文字幕亚洲综合久久蜜桃| 日日做夜狠狠爱欧美黑人| 抓住我的双乳咬我奶头视频看| 小12箩利洗澡无码视频网站| 18成禁人视频免费网站| 精品一区二区三人妻视频 | 丰满少妇高潮惨叫久久久一| 久久久久免费看成人影片| 人妻丰满熟妇av无码区| 日韩欧美亚洲综合久久影院ds| 日本熟妇xxxx乱| 最新国产精品精品视频| 国产xxxxx在线观看| 久久久国产精品va麻豆| 亚洲中文字幕无码爆乳app| 脱了老师内裤猛烈进入| 无码av中文一区二区三区桃花岛| 中文无码精品一区二区三区| 人与嘼交av免费| 日韩一区二区三区精品| 丰满少妇被猛烈进入试看| 亚洲精品午夜国产va久久成人| 狠狠躁夜夜躁人人爽天天不卡| 播放灌醉水嫩大学生国内精品| 精品久久人人爽天天玩人人妻| 欧美xxxx色视频在线观看瑜伽| 国产成人无码aa精品一区| 国产精品99久久不卡| 人妻在卧室被老板疯狂进入| 48沈阳熟女高潮嗷嗷叫| 亚洲av无码乱观看明星换脸va| 久久久久久久综合日本| 精品人妻无码专区中文字幕| 日本高清在线一区二区三区| 久久久久亚洲av成人片| 少妇撒尿bbwbbwbbwbbw毛| 欧美丰满熟妇bbbbbb百度| 9久9在线视频 | 传媒|