在线永久免费观看黄网站-亚洲旡码欧美大片-亚洲日韩v无码中文字幕-真实的国产乱xxxx在线

S&T: Deposit welding Robot is commissioned at SFRE

Date:2019/2/5 Source: CISDI

Deposit welding Robot is commissioned at SFRE

CISDI teams have created a robot capable of high-quality deposit welding.

During pilot tests, the robot was able to perform surface deposit welding on wedges, guides and support sleeves.

It has now been handed over to SFRE and is in commission in one of its workshops, where the robot’s welds are so reliable, no defects have been detected by the surface flaw inspector.

Copper surface deposit welding prevails at SFRE. However, it’s a dangerous task; high-heat toxic gas, metal steam and metal dust are generated which are dangerous to workers’ health. Producing welds of consistent quality also requires a high level of skill and labour and procedure-transfer costs can be high.

The Robot can complete non-standard copper deposit welding at one duty position and reduces manpower.

CISDI will transplant the knowledge it has gained into other metallurgical robot developments.

 

Deposit welding robot fact file:

Applicable for non-standard copper deposit welding in a single piece and in small batches, with diverse varieties and without clamps, and also for the automatic deposit welding of carbon steel and stainless steel

Stable and reliable quality

Gives a high degree of flexibility. The robot can be adapted for various shapes of surface deposit welding and for non-standard, clamp-free and positioning-free pieces

Easy training – no need for repeat programming

Much less labour-intensive

Can be programmed offline

Capable of deposit welding on curves in a complicated space

 

Below; comparisons between robot-work and manual deposit welding:

Method

Efficiency

Quality

Human Risk

Rectangular surface

230mm×85mm

Triangular surface

230mm, 70mm

Long bar surface

1,180mm×20mm

Robot

Preparation time (min.)

Welding time (min.)

Preparation time (min.)

Welding time (min.)

Preparation time (min.)

Welding time (min.)

Reliable and stable, a high first pass rate, zero re-working

No human involvement

8

32

5

11

6

25

Manual

Welding time (min.)

Welding time (min.)

Welding time (min.)

Unstable quality, a low pass rate, a high re-working rate

High risk of severe injury from toxic gas and metals dust

50

25

45

 

The rotary arm of a deposit welding robot in action

 

The working plane of a deposit welding robot

 

Wedges with deposit welding completed by the robot


A drum with deposit welding performed by the robot

主站蜘蛛池模板: 免费一本色道久久一区| 最新国产精品剧情在线ss| 中文精品一卡2卡3卡4卡葡京| 欧美乱妇高清无乱码在线观看| 久久婷婷国产综合精品| 国产欠欠欠18一区二区| 精品国产精品久久一区免费式| 高清无码视频直接看| 少妇三级全黄| 97成人碰碰久久人人超级碰oo| 国产女人高潮抽搐叫床视频| 无码夫の前で人妻を侵犯| 在线观看av永久免费| 久久久久亚洲av无码专区首jn| 国产一起色一起爱| 丰满少妇弄高潮了www| 蜜桃麻豆www久久囤产精品| 麻豆传煤入口免费进入2023| 成人无码特黄特黄av片在线| 双乳被一左一右吃着动态图| 国产精品天干天干| 中文字幕精品一二三四五六七八 | 久久久亚洲欧洲日产国码农村| 免费无码一区二区三区| 久久青草亚洲av无码麻豆| 亚洲毛片无码专区亚洲乱| 国产av麻豆mag剧集| 内射爽无广熟女亚洲| 337p日本欧洲亚洲大胆精品| 狠狠躁夜夜躁人人爽天天5| av在线亚洲欧洲日产一区二区| 欧美人与动xxxxz0oz小说| 天天爽天天爽天天爽| 擦老太bbb擦bbb擦bbb擦| 亚洲人交乣女bbw| 又黄又爽又色又刺激的视频| 人人澡人人澡人人看添av| 色妞ww精品视频7777| 影音先锋女人av鲁色资源网久久| 在厨房被c到高潮a毛片奶水| 进女小姪女体内的视频|